Инновационные решения в области качества воздуха
HisoAir-Logo
Запрос сейчас

HisoAir applies patented airflow structures, filter-access mechanisms, dual-installation systems and protected industrial designs to market-ready air purifier platforms. These technologies help OEM and ODM brands shorten development cycles, reduce structural risks and create products with clearer functional and visual differentiation.
A modern air purifier with a sleek design showing airflow and internal components. Features wall-mounted and floor-standing setup options.

Real Engineering Evidence

Authentic documentation, laboratory validation, and engineering assets from our successful projects.

Anechoic Chamber Testing
TEST

Anechoic Chamber Testing

Noise and acoustic performance validation for high-CADR models.

facility:Internal Acoustic Lab
model:HA-400
Model-Specific Certification
REPORT

Model-Specific Certification

Official UL safety test report for North American market entry.

reportNumber:UL-E123456
date:2023-10
Certified BOM
ENGINEERING

Certified BOM

Strict control of critical components and materials for mass production.

facility:Manufacturing Record
Temperature Rise Analysis
REAL PROJECT

Temperature Rise Analysis

Validation of safety under extreme continuous operation conditions.

model:HA-700 Series

Project Evidence

Real engineering cases where our compliance expertise accelerated market entry.

Matter over Thread Air Purifier
Global Smart Home Brand (Japan)

Matter over Thread Air Purifier

CHALLENGE

Integrating new Matter over Thread protocols while ensuring strict Japanese market compliance.

ENGINEERING WORK

Conducted pre-compliance RF testing and coordinated directly with local certification bodies.

Result:Passed certification on first official submission, saving 6 weeks of development time.
Evidence:Pre-compliance Test Report
High-CADR Air Purifier Series
North American & European OEM

High-CADR Air Purifier Series

CHALLENGE

Simultaneous market entry requiring dual certification (UL/FCC and CE/RED) without redundant testing.

ENGINEERING WORK

Developed a unified certification roadmap and optimized the BOM to meet both standards.

Result:Reduced testing costs by 30% and achieved concurrent launches.
Evidence:Dual Certification Strategy
Compliance Rectification
European Importer

Compliance Rectification

CHALLENGE

Existing product failed EMC and temperature rise tests at a third-party lab.

ENGINEERING WORK

Engineered structural modifications and electrical shielding adjustments within 2 weeks.

Result:Successfully passed re-testing and obtained CE marking.
Evidence:EMC Modification Record

Ready to leverage our air treatment core
capabilities?

Partner with Hisoair for your next ODM project. Get access to our world
class manufacturing and R&D facilities.
Discuss Your Next Project

ЗАПРОСИТЬ ЦИТАТУ