Soluciones innovadoras para la calidad del aire
{mb_capability_hero_tag_icon_tag}

{mb_capability_hero_tag}

HisoAir helps OEM and ODM customers integrate certification and compliance requirements into product development from the beginning. Our support covers air purifiers, humidifiers, air quality monitors and connected indoor air quality devices, helping reduce failed testing, late-stage redesign and avoidable market-entry delays.
North America
Europe / UK
Connected Products
Performance Claims
Discuss Your Certification RoadmapReview Compliance Evidence
Display of product compliance standards and performance testing certifications, including safety, EMC, CARB compliance, and performance testing metrics, on a modern background.
MARKETSNorth America / EU / UK
SUPPORT SCOPEPlanning → Certification
ENGINEERINGDesign / Testing / Documentation
PRODUCTIONCompliance Control

How This Capability Works

01

Requirement

02

Diseño

03

Prototype

04

Pre-Test

05

Certificación

06

Producción

Compliance Planning & Roadmap
Pre-Compliance Testing
Technical Documentation & Coordination

Compliance Planning & Roadmap

Market, product, and standards analysis to define clear, efficient certification paths before development begins.

ENGINEERING SCOPE
Market standard analysis
Product classification
Certification route planning
Cost & timeline estimation
DELIVERABLES
Certification Roadmap
Applicable Standards List
Requisitos de las pruebas
EVIDENCEPlanning Documentation
Compliance Planning & Roadmap
Pre-Compliance Testing

Pre-Compliance Testing

Early-stage laboratory validation to identify and resolve compliance risks before official submission.

ENGINEERING SCOPE
Safety and temperature rise testing
EMC/EMI pre-scanning
Acoustic noise validation
Ozone emission testing
DELIVERABLES
Pre-test Reports
Failure Analysis
Rectification Plan
EVIDENCEAnechoic Chamber Data

Technical Documentation & Coordination

Comprehensive management of engineering files, BOMs, and direct coordination with third-party laboratories.

ENGINEERING SCOPE
Critical component (CDF) management
Label and manual compliance
Structural drawing review
Lab sample and query handling
DELIVERABLES
Certified BOM
Technical Construction File (TCF)
Official Test Reports
EVIDENCEUL/CE Documentation
Technical Documentation & Coordination

Real Engineering Evidence

Authentic documentation, laboratory validation, and engineering assets from our successful projects.

Anechoic Chamber Testing
TEST

Anechoic Chamber Testing

Noise and acoustic performance validation for high-CADR models.

facility:Internal Acoustic Lab
model:HA-400
Model-Specific Certification
REPORT

Model-Specific Certification

Official UL safety test report for North American market entry.

reportNumber:UL-E123456
date:2023-10
Certified BOM
ENGINEERING

Certified BOM

Strict control of critical components and materials for mass production.

facility:Manufacturing Record
Temperature Rise Analysis
REAL PROJECT

Temperature Rise Analysis

Validation of safety under extreme continuous operation conditions.

model:HA-700 Series

Project Evidence

Real engineering cases where our compliance expertise accelerated market entry.

Matter over Thread Air Purifier
Global Smart Home Brand (Japan)

Matter over Thread Air Purifier

CHALLENGE

Integrating new Matter over Thread protocols while ensuring strict Japanese market compliance.

ENGINEERING WORK

Conducted pre-compliance RF testing and coordinated directly with local certification bodies.

Result:Passed certification on first official submission, saving 6 weeks of development time.
Evidence:Pre-compliance Test Report
High-CADR Air Purifier Series
North American & European OEM

High-CADR Air Purifier Series

CHALLENGE

Simultaneous market entry requiring dual certification (UL/FCC and CE/RED) without redundant testing.

ENGINEERING WORK

Developed a unified certification roadmap and optimized the BOM to meet both standards.

Result:Reduced testing costs by 30% and achieved concurrent launches.
Evidence:Dual Certification Strategy
Compliance Rectification
European Importer

Compliance Rectification

CHALLENGE

Existing product failed EMC and temperature rise tests at a third-party lab.

ENGINEERING WORK

Engineered structural modifications and electrical shielding adjustments within 2 weeks.

Result:Successfully passed re-testing and obtained CE marking.
Evidence:EMC Modification Record

Ready to leverage our air treatment core
capabilities?

Partner with Hisoair for your next ODM project. Get access to our world
class manufacturing and R&D facilities.
Discuss Your Next Project

SOLICITAR PRESUPUESTO